Since 1997, Dr. Ingo Riess is active in the field of tunnel ventilation and tunnel safety. In this professional capacity, he had a leading role in more than 150 tunnel ventilation projects all
over the world. A few references are listed here:
-
Tunnel Agua Negra AR-CL, 13 km, transverse ventilation, preliminary design
-
A22 Kaisermühlentunnel AT, 2.2 km tunnel network, longitudinal ventilation, retrofit design, tender specification
-
S1 Lobautunnel AT, 8.2 km, transverse ventilation, detailed design
-
Cross City Tunnel Sydney AU, 2.2 km, longitudinal ventilation with portal air extraction, all project phases
-
Airport Link / Northern Busway Brisbane AU, 5.6 km, longitudinal ventilation with portal air extraction, local smoke extraction, tender
design
-
Oosterweelverbinding BE, div., longitudinal ventilation, concept design
-
Underground Roundabout Frauenfeld CH, 0.4 km, integral safety assessment
-
Gotthard Base Tunnel CH, 57 km, egress ventilation, safety assessment
-
A13 Tunnel Isla Bella CH, 2.3 km, longitudinal ventilation with local smoke extraction, retrofit, all project phases
-
A8 Tunnel Giswil CH, 2.1 km, longitudinal ventilation with local smoke extraction, all project phases
-
A13 Tunnel Viamala CH, 0.8 km, longitudinal ventilation, retrofit, all project phases
-
A13 Tunnel Bärenburg CH, 1.0 km, longitudinal ventilation, retrofit, concept design, risk analysis
-
Hongkong-Zuhai-Macau Tunnel CN, 7.5 km, tunnel ventilation design review
-
BAB A7 Elbe Tunnel DE, 2.7 km, transverse ventilation, retrofit detailed design, commissioning
-
B2 Luise-Kiesselbach-Tunnel Munich DE, 1.5 km, longitudinal ventilation, all project phases
-
Montblanc Tunnel FR-IT, 11.6 km, transverse ventilation, analysis of the fire in 1999
-
Chenani Nashri Tunnel IN, 9.2 km, transverse ventilation, expert consultancy to the general contractor
-
Bypass Meran IT, 3.2 km, longitudinal ventilation with local smoke extraction, detailed design
-
Sharq Crossing Doha QA, 6 km, longitudinal ventilation with smoke extraction, tunnel ventilation concept design, integral safety concept
-
Tunnel Visnove SK, 7.5 km, longitudinal ventilation with point smoke extraction, tender design
-
Ovit Tunnel TR, 14.3 km, longtudinal ventilation with air exchange and point smoke extraction, detailed design
Dr. Riess is associate member of the working group "Sustainability in Road Tunnel Operation" of the PIARC committee on road tunnel operations. PIARC is an international organisation of
experts on roads and traffic.